Task: Design a skyway which either connects Block E48 to E08 or connects E40 to E49 in School of Housing, Building & Planning (HBP).
My group decides to choose the connection from Block E48 to E08.
In this project, I really have gained lots of knowledge. For instance, before designing a skyway or even a building, site analysis is very important which mean I should go for a site visit at the beginning to identify the sun path, wind speed & direction, pollution, soil condition, temperature, rain, vegetation and etc. Besides that, I also know the meaning of key plan, location plan and site plan.
Studio life ~ still doing studiowork in the midnight |
Site Analysis (using DERWENT colour pencils) |
Model of designed skyway |
Model with the landscape |
|
Site Analysis+Model+Blueprint |
Although we finished the project in very late night, I can feel the satisfaction after done due to they are all from our hard work. Appreciate them :-)
For more info about integrated studio Session 2012/2012, kindly visit http://www.hbp.usm.my/rus1042012/main.html
No comments:
Post a Comment